# Enter the Field v0.4 — Master Route Map

## Release principle

Netlify is the finish line, not the workshop. All inventory work, content authoring, Project Genome generation, media intake, coding, and verification happen offline. The v0.4 release budget is **two Netlify deployments**:

1. **Release Candidate:** only after all local gates pass.
2. **Final Review:** after all review notes are resolved in one batch.

A third deployment is reserved for a genuine broken-route, security, or runtime defect.

## Core information architecture

| Route | Experience | v0.4 decision |
|---|---|---|
| `/` | Arrival Field | Keep — Primary orientation, visitor paths, signals, featured constellation. |
| `/world` | World Map | Expand — Turn conceptual nine-region map into real region counts, featured projects, and relationship paths. |
| `/projects` | Project Registry | Expand — Data-driven catalog generated from the master inventory. |
| `/projects/[slug]` | Reusable Project Genome Room | Build — Generate every project room from structured genome data and static params. |
| `/regions/[slug]` | Region Landing Room | Build — Nine static region pages with purpose, projects, relationships, and paths. |
| `/gallery` | Visual Gallery | Build — Posters, screenshots, diagrams, covers, hardware concepts, and project art. |
| `/archive` | Archive Index | Build — Documents, specifications, histories, release packages, and virtual-file taxonomy. |
| `/music` | Music Archive & Radio | Build — Curated artist lanes, playlists, soundtracks, and project-linked music. |
| `/ledger` | Public Ledger | Build — Approved receipts, releases, papers, validation runs, and claim-boundary changes. |
| `/wellness` | Human Garden Entrance | Expand — Preserve quiet mode; replace future cards only when real experiences exist. |
| `/principles` | Principles & Boundaries | Build — Human authority, ledger above ego, consent, exit rights, evidence, and honest limitations. |
| `/about` | About Parallax | Build — Clear explanation of Parallax, Phi369 Labs, Enter the Field, and Michael’s role. |
| `/contact` | Contact & Collaborate | Build — Link to the lightweight business-card hub and carefully scoped collaboration lanes. |
| `/search` | Unified Search | Defer — Start with client-side filters; add a dedicated route only after content volume justifies it. |

## Build sequence

1. Freeze v0.3.4 as the rollback baseline.
2. Approve the Master Constellation Inventory.
3. Convert approved rows into Project Genome records.
4. Generate reusable project and region routes.
5. Complete Tier 1 rooms.
6. Add gallery, archive, music, and ledger layers.
7. Run all verification locally.
8. Deploy v0.4 Release Candidate once.
9. Batch review corrections offline.
10. Deploy v0.4 Final Review once.
