01
Origin condition
Why it exists
A deterministic, receipt-aware stage for interactive performances, audiovisual scenes, and collaborative playable experiences. The B3 foundation records this project inside the wider constellation so its purpose, maturity, evidence class, missing artifacts, and relationships can be reviewed without pretending that every part is finished.
What must Parallax Playhouse demonstrate before its promise can be treated as a dependable capability?
02
Working system
What it does
- ◎Preserves the project identity
Carries the stable ID PRJ-PPH-001, canonical slug, region placement, purpose, maturity, and evidence classification.
- ⌁Exposes artifact readiness
4 Ready, 3 Partial, and 1 Missing artifact lanes remain visible instead of being silently filled with claims.
- ↝Connects the wider constellation
Links 2 documented nearby project relationships.
03
System anatomy
Architecture
This B3 foundation room preserves Parallax Playhouse as a structured project record. A project-specific architecture has not yet been approved for this non-Tier 1 room.
Registry identity
Stable ID, slug, regions, maturity, evidence, visibility, and source basis.
Project-specific architecture
Components, interfaces, authority, data, and failure behavior awaiting detailed room review.
04
Present tense
Current state
Parallax Playhouse is recorded as Prototype at the Growing stage. 4 artifact lanes are marked Ready, 3 are Partial, and 1 are Missing in the master inventory.
B3 foundation draft · Tier 2 · Core canon confidence · private-review
05
Honest edges
Known limitations
- This room is an inventory-derived B3 foundation record, not a claim that the project is complete or publicly validated.
- The current evidence classification is Operational; it applies only to the work actually represented by the cited source basis.
- The current inventory marks these artifact lanes as missing: publicLink.
- Show the Phi Spiral pilot and deterministic validation receipts.
06
Claim boundary · v1.0.0
What we are—and are not—saying
The current record supports that Parallax Playhouse is an indexed Parallax project with the stated purpose, prototype status, growing maturity, operational evidence classification, and the source basis shown below.
This foundation room does not establish that Parallax Playhouse is complete, commercially available, scientifically proven, legally approved, safe for unsupervised deployment, or endorsed by any organization not explicitly identified in a reviewed source.
07
Development memory
Ledger
B3F-PPH-001Imported Parallax Playhouse into the v0.4 Master Constellation registry.
✓ RecordedSRC-PPH-001Playhouse pilot v0.5.1 accepted
✓ Awaiting room reviewFoundation planning receipts · production-ledger integration pending
08
Directional, revisable
Roadmap
Genome foundation review
Confirm the name, purpose, region, visibility, canon confidence, and claim boundary before deep content is added.
Artifact intake
Attach reviewed specifications, images, demonstrations, repositories, public links, and verified receipts in one offline batch.
Public room acceptance
Promote the room only after its content, claims, accessibility, privacy, and outbound links pass the publication gates.
10
Publication intake
Artifacts & sources
Playhouse pilot v0.5.1 accepted
Inventory-listed source basis awaiting project-specific artifact intake and human publication review.
View archive recordarchive:intake/parallax-playhouse/source-basisSource basis
constellation:project/parallax-playhouse@b3-foundationplanning-inventoryReview: Canon, claims, privacy, and publication review · pending
11
Move with evidence